Family built. Field proven. Since 1994.Talk to our team: 765-617-4994

Planning tools

Start with your harvest.

Turn your operating assumptions into a useful project conversation. Save a scenario, compare alternatives and send the inputs to Knopp.

Example inputs are prefilled to demonstrate the arithmetic. Replace them with your operation. Zero equipment ratings mean unknown. This worksheet does not select or approve equipment.

01 / Your operation

Build a harvest scenario.

Your device-only plan library

Saved planning scenarios

These are not an account or cloud record. Download a small plan file to keep a backup or move scenarios between your own devices.

No saved scenarios on this device

Save the current worksheet or import a Knopp planning export. Importing does not send anything to Knopp.

Plan files contain only the planning inputs shown here. Review imported ratings and conditions before relying on the worksheet.

A separate geometry check

Will the auger reach?

Enter the usable straight-line intake-to-discharge length and heights, using the same level datum. Obtain the permissible angle range from the exact equipment manufacturer.

Geometry: rise = discharge height − intake height; angle = asin(rise ÷ usable length). Roofline clearance requires a separate equipment- and site-specific review.